# Workload Trends

Visualize how work is distributed across your team and over time. Spot overload, idle capacity, and bottlenecks before they become resignations or missed sprints.

Workload · Backend team · last 12 weeks

1 overloaded

- **Maya**  
  Backend  
  balanced  
- **Jordan**  
  Backend  
  balanced  
- **Priya**  
  Frontend  
  overloaded  
- **Sam**  
  Frontend  
  light  
- **Alex**  
  Platform  
  balanced

### Per-member workload heatmap

### Burnout signals before they hit

### Sprint-over-sprint trend tracking

### Slack alerts when someone is at risk

## What we measure

### Workload is more than open tickets

iftrue blends active assignments, in-flight PRs, review load, on-call rotations, and meeting density into a single workload score per engineer. Then tracks it sprint over sprint so you see drift, not just snapshots.

- **Active work**: Open tickets weighted by complexity, in-flight PRs, and ongoing investigations.
- **Review load**: PRs assigned for review, including the senior engineers everyone defaults to.
- **Hidden load**: On-call rotations, meeting density, and after-hours activity that never shows in a sprint board.

### Workload composition · Priya

- Active tickets 35%  
- PR review queue 28%  
- On-call rotation 18%  
- Meetings 14%

**Total load: 95%**  
**Sustained for: 4 weeks**

## Burnout signals

### Leading indicators, not exit interviews

Burnout has leading indicators if you know where to look. iftrue watches them automatically and pings you in Slack the moment any threshold is crossed.

#### Sustained overload

Workload above 85% for 3+ consecutive weeks. The strongest single predictor of burnout.

#### After-hours creep

Commits and reviews happening regularly outside working hours. Occasional is fine. Chronic is a signal.

#### Review monopoly

One engineer reviewing more than 40% of team PRs. Bus factor risk and reviewer fatigue at once.

#### Meeting saturation

Meeting time exceeds 30% of working hours. Engineering output drops sharply past that line.

iftrueAPP 9:00 AM · DM to manager

**Workload imbalance suggestion**  
**Priya** is at 95% load (4th straight week). **Sam** is at 28% with frontend capacity.

**Suggested moves:** **PROJ-512** and **PROJ-518** from Priya to Sam. Both are frontend tickets, both unassigned PRs.

## Specific moves, not vague nudges

Generic "your team looks busy" alerts don't help. iftrue suggests concrete reassignments: which tickets to move, who to move them to, and why both engineers benefit. Approve the move and reassign in Jira without leaving Slack.

## Who it's for

### Built for engineering leaders

#### Engineering Managers

See workload balance across your team at a glance. Spot the engineer carrying twice the load before they burn out.

#### Tech Leads

Rebalance ticket assignments based on real workload data, not gut feel. Stop overloading your most senior people.

#### VPs of Engineering

Compare workload distribution across teams. Identify systemic capacity issues before they show up in attrition numbers.

## See what your engineering org is missing.

30-minute walkthrough, tailored to your stack. No slides. Your team's data.
